Project Details

Keyport Pier Replacement

Project started in 2000
Project completed in 2002
Project Type: Marine
Owner: Department of the Navy, Naval Facilities Engineering Command
Location: Keyport, WA
Contract Amount: $6.1 Million
Designer: BERGER/ABAM
 

A new T-pier with 200 lin ft of fixed berthing and a 120 ft floating finger pier were built to support transient Navy vessels and small crafts. The facility also includes a floating boathouse, to provide covered moorage for the Admiral's barge, and three smaller slips. Mechanical and electrical utilities were provided for all new structures along with relocation and installation of existing jib cranes and other vessel service equipment. Demolition of two existing timber piers and the existing fixed boathouse were included as part of the project scope.

 

__________________________________________________________
This page was generated on 9/10/2010.
< Show most current projects
< Back
< Go to the Search
 

< Print