Project Details
Lake Youngs Intake
Project started in 2002
Project completed in 2003
Project Type: Marine
Owner: Seattle Public Utilities
Location: Seattle, WA
Contract Amount: $5.5 Million
Designer: CH2M Hill
This project required construction of a steel intake pier 450 ft into an active drinking water reservoir. Our work included 500-tons of fabricated steel supported by 22 piles in four piers. The 175 ton, 50 x 100 ft pump platform was assembled in place before lowering 20 ft and driving piles. In completed form it has steel walls and floor, slide gates, a jib crane and 8 pumps manifold to twin 6 ft pipes back to the beach. The work required a trestle, sheet cell, sectional barges with a 165-ton crane and extensive silt curtains.