Project Details

Neah Bay Coast Guard Pier

Project started in 1999
Project completed in 2000
Project Type: Marine
Owner: U.S. Coast Guard
Location: Neah Bay, WA
Contract Amount: $3.2 Million
Designer: BERGER/ABAM
 

General Construction Company partnered with BERGER/ABAM for this Design/Build project. The contract required demolition of an existing 650 ft timber pier and construction of a new replacement concrete pier and concrete mooring floats. The construction included 16 in. diameter concrete piles, poured in place caps, precast deck panels, and crane beams. In addition to the new pier, a custom 25-ton capacity 'Marine Travelift' boat hoist was installed.

 