Industrial Projects

Listed below are marine projects that are completed or currently under construction. To view details for each project, please click the project name.

 

Heating System Upgrade

Started in November 2006 - Completed January 2007
General Construction replaced the majority of the mechanical fittings on the existing heating system's carbon steel pipes with welded fittings.

Production Line Hydraulic System

Project started mid 2006 - Project completed July 2007
General Construction furnished and installed this system, which supplies hydraulics to the assembly line.

Napkin Packaging Line Installation

Project started in September 2004 - Project completed in February 2005
General Construction installed a converting and packaging production line at a paper manufacturing mill.

Automobile Shredder

Project started in September 1999 - Project completed in February 2000
Installation of a state of the art automobile shredder for recycling automobiles into scrap steel.

Relocate and Upgrade Tissue Packaging Line

Project started in October 2005 - Project completed in February 2006
For this project General Construction moved and upgraded a production line which converts very large rolls of tissue to finished product.

Compressed Air Upgrades

Project started in October 2004 - Project completed in December 2004
This project included installation of a new 3,000 CFM air compressor.

Tissue Machine Rebuild

Project started in November 2005 - Project completed in January 2006
General Construction replaced and relocated paper rolls, the drying air system, two 9 MM BTU burners and a Smartfire control system.

Continuous Homogenizing Furnace

Project started in June 1998 - Project completed in December 1998
The objective of this project was to replace an existing aluminum billet homogenizing system with a state-of-the-art fully automatic continuous homogenizing system.

Paper Machine Drive Upgrade

Project started in January 2005 - Project completed in November 2005
General Construction replaced all 42 DC motors in a tissue machine at paper manufacturing facility in Washington.

Paper Machine Fan Pump Drives

Project started in January 2004 - Project completed in March 2004
General Construction Company replaced the drives, cabling and motors for three 600 Hp fan pumps at a paper manufacturing facility in Washington.

Substation Replacement & Power System Upgrades

Project started in January 2004 - Project completed in July 2004
General Construction was responsible for building a new substation at paper manufacturing facility.

Stacker Crane Replacement

Project started in April 2007 - Project finished September 2007
This project included the installation of approximately 3,500 lin ft of crane rail.

Everett Factory Realignment

Project started in 2006 - Project completed in 2007
Conversion of 170,000 sq ft of manufacturing space into office facilities.

Switchgear Relocation

Project started in 2006 - Project completed in 2007
This project included the relocation of a new primary 15kV distribution system and switchgear.

Crane Upgrade

Project started in 1999 - Project completed in 2003
This program upgraded the overhead bridge cranes in five assembly buildings at customer's Renton plant.

Factory Seismic Upgrade

Project started in 1997 - Project completed September 2002
General Construction structurally reinforced client's assembly facility in Everett.

Scott Worldwide Cogeneration Project

Project started in 1993 - Project completed in 1995
For this project General Construction built a state-of-the-art cogeneration facility primarily for burning spent sulfite liquid from the pulping process and sawdust from area sawmills.

Skylight Installation Project

Project began in October 2007 - Projected completed December 2008
This project included the installation of giant 25 ft x 27 ft skylights in a huge manufacturing facility in Everett.

Tissue Paper Machine 3 Rebuild

 - Project completed in 1997
This project included the installation of a new head box, Yankee dryer hood with burners and gas train, drives, vacuum system, pumps, piping, pressure screen, showers and control system.

 