Relocate and Upgrade Tissue Packaging Line - Everett, Wash.
General Construction installed new equipment, relocated existing equipment and replaced electric drives and controls. The electrical and instrument work included 16 new variable frequency drives, a safety interlock system on machine guards, photoeyes and solenoid valves.