Tissue Machine Rebuild - Everett, Wash.
General Construction installed new variable frequency AC drives, motors and a new wet dust collection system. We modified building structural steel to support additional loads from the new equipment. The majority of work was done during a 12 day outage, with shifts of over 100 craftsmen working around the clock.